90-day Carefree Guarantee + Free Returns. Learn More

Everything Mary XL 4 Wheel Collapsible Rolling Sewing Machine Storage Case, Artistic Floral

39 items left

Express your creativity from home to workshop with the Everything Mary XL Rolling Sewing Machine Case in Artistic Floral. Designed for makers who move between projects and spaces, this rolling tote keeps your machine protected and your supplies organized wherever creativity takes you.

  • Craft-ready storage – A secure main compartment paired with multiple pockets keeps tools, notions, and accessories organized and easy to find.
  • Effortless mobility – Four smooth-rolling 360° wheels provide stable, easy movement through tight spaces and across varied surfaces.
  • Durable, everyday construction – High-quality, smudge-resistant polyester is built to withstand frequent use while protecting your gear.
  • Compact and efficient – Designed to hold your machine and supplies in one streamlined tote, reducing clutter and setup time.
  • Easy storage between projects – Collapsible design allows the case to store neatly when not in use.

Fit & Dimensions

  • Interior (W x D x H): 19.50" x 10.50" x 14.00"
  • Exterior (W x D x H): 22.00" x 13.50" x 17.75"

Compatibility Note: Sewing machine sizes vary by brand and model. Always compare your machine’s dimensions to the interior measurements listed above to ensure the best fit.

Order today and get free ground shipping for all orders over $49! Please note, all orders are shipped from our warehouse Eugene, Oregon.

We are here to help! Please contact us at care@everythingmary.com. Our average response time is within 18 hours :).

Customer Reviews

Based on 19 reviews
89%
(17)
5%
(1)
0%
(0)
0%
(0)
5%
(1)
M
Mary

It is great. I’m already for some retreats this winter in my area. I love everything that Everything Mary has.

C
Cheryl

Great bag. Well constructed, packaged well and shipped quickly. Looks exactly like the ads and is well made. Highly recommend Everything Mary!

C
Cheryl

Great bag. Well constructed, packaged well and shipped quickly. Looks exactly like the ads and is well made. Highly recommend Everything Mary!

T
Tammy F.
Great case

It arrived fast fits my machine well. I can’t wait for my next class to use it

K
Kim H.
XL 4 Wheel Collapsible Deluxe Sewing Machine Storage Case

Looks of the case is beautiful! Plenty of pockets all around. However, I purchased a Viking 500 machine with cover, small plastic case with extra feet and manual. The actual trolly with the wheels attached to the case, doesn’t feel strong or sturdy enough when you try to roll it across the floor.

Make Like an Insider