90-day Carefree Guarantee + Free Returns. Learn More

XL 4 Wheel Collapsible Deluxe Rolling Sewing Machine Storage Case, Purple Floral

47 items left

Travel beautifully with the Everything Mary XL Rolling Sewing Machine Case in Purple Floral Quilted. Designed for makers who want dependable protection without sacrificing style, this rolling case keeps your sewing machine and supplies organized, secure, and easy to transport—whether you’re heading to class, a retreat, or storing your setup at home.

  • Spacious main compartment – Custom-fit interior cradles most standard sewing machines with room for cords, foot pedals, and essential accessories.
  • Durable, craft-ready construction – Reinforced polyester exterior with padded interior panels helps protect your machine from bumps, scuffs, and everyday wear.
  • Smooth 4-wheel mobility – Four spinner wheels provide stable, easy rolling through classrooms, hallways, and tight spaces.
  • Thoughtful organization – Multiple exterior and interior pockets keep thread, scissors, notions, and tools visible, secure, and within reach.
  • Collapsible for easy storage – Structured yet flexible frame folds down for convenient storage between projects or trips.

Fit & Dimensions

  • Interior (W x D x H): 19.50" x 10.50" x 14.00"
  • Exterior (W x D x H): 22.00" x 13.50" x 17.75"

Compatibility Note: Sewing machine sizes vary by brand and model. Always compare your machine’s dimensions to the interior measurements listed above to ensure proper fit.

Order today and get free ground shipping for all orders over $49! Please note, all orders are shipped from our warehouse Eugene, Oregon.

We are here to help! Please contact us at care@everythingmary.com. Our average response time is within 18 hours :).

Customer Reviews

Based on 19 reviews
89%
(17)
5%
(1)
0%
(0)
0%
(0)
5%
(1)
M
Mary

It is great. I’m already for some retreats this winter in my area. I love everything that Everything Mary has.

C
Cheryl

Great bag. Well constructed, packaged well and shipped quickly. Looks exactly like the ads and is well made. Highly recommend Everything Mary!

C
Cheryl

Great bag. Well constructed, packaged well and shipped quickly. Looks exactly like the ads and is well made. Highly recommend Everything Mary!

T
Tammy F.
Great case

It arrived fast fits my machine well. I can’t wait for my next class to use it

K
Kim H.
XL 4 Wheel Collapsible Deluxe Sewing Machine Storage Case

Looks of the case is beautiful! Plenty of pockets all around. However, I purchased a Viking 500 machine with cover, small plastic case with extra feet and manual. The actual trolly with the wheels attached to the case, doesn’t feel strong or sturdy enough when you try to roll it across the floor.

Make Like an Insider