90-day Carefree Guarantee + Free Returns. Learn More

Everything Mary XXL Rolling Sewing Machine Case with Wheels in Red & Tan Floral – Oversized Sewing Machine Tote Bag for Travel & Classes

110 items left

Carry more with the Everything Mary XXL Rolling Sewing Machine Case in Red & Tan Floral. Designed for makers with larger machines and bigger plans, this oversized wheeled case protects your sewing or embroidery machine while keeping fabric, thread, and tools neatly organized. A sturdy telescopic handle and smooth wheels make transport to classes and retreats easy, so every project starts calmer, feels lighter, and stays beautifully organized from setup to cleanup.

  • Oversized interior – Roomy enough for larger sewing and embroidery machines plus fabric, patterns, and tools.
  • Smooth rolling mobility – Four 360-degree spinner wheels and a sturdy telescopic handle move a heavier machine with ease.
  • Organized storage – Multiple interior and exterior pockets keep accessories visible, secure, and easy to reach.
  • Collapsible design – Structured in use and folds flat for convenient storage when space is limited.
  • Durable construction – Quality materials and reinforced stitching stand up to frequent use and on-the-go crafting.

Thoughtfully designed by makers, for makers, it keeps your machine protected and your supplies in order—so you can focus on the simple joy of creating.

Fit & Dimensions

  • Interior (W x D x H): 22" x 13" x 15"
  • Exterior (W x D x H): 26" x 16" x 19"

Compatibility Note: Sewing machine sizes vary by brand and model. Always compare your machine’s dimensions to the interior measurements above to ensure the best fit.

Order today and get free ground shipping for all orders over $49! Please note, all orders are shipped from our warehouse Eugene, Oregon.

We are here to help! Please contact us at care@everythingmary.com. Our average response time is within 18 hours :).

Customer Reviews

Based on 29 reviews
83%
(24)
3%
(1)
0%
(0)
0%
(0)
14%
(4)
K
Kathleen W.
Holds EVERYTHING

What a fabulous case! It is heavy, though, but sturdy and I have no fear of shifting items or tipping since the wheels are so stable. The only request I have - and it's not a criticism - is that it would have been helpful to have more information as to which machines fit which case. Even with measuring the XXL case is far too large for my 300 series Bernina. BUT, everything fits - the machine, knee lever, table extension, feet case, fabric, all the supplies I need to bring to quilting class - so the extra space has been helpful and well utilized. A plus is how classy it looks!

N
Novice S.
Great XXL Sewing Machine Case, Wonderful Customer Service and FAST Shipping

I forgot to apply my welcome coupon, so I emailed customer service and within a few hours they had issued a refund for the discounted amount. The case itself is sturdy, and the color (I got purple) is exactly as pictured.
My only issues are the side zippers were a pain to close, but I don't plan to unzip it again, so it was once and done, and the plastic pockets on the upper lid seem a bit flimsy, only being held on by a single wobbly line of stitching. Maybe I won't pack those too full...
The wheels however are like butter and it's kinda fun to roll it around. Granted, I have non-carpeted floors but considering how smooth the wheels are, carpet shouldn't be an issue.
I got this case to grow into, I currently have my machine, my iron and tracing paper, crochet and knitting needles and all the accompanying notions with still so much room to spare.
The fast shipping is enough to make me come here first when I need something delivered in record time (it shipped from Memphis TN and I live in South Texas), and it was free!

D
Dawn

It seems to be good quality, I haven’t really checked too much as it’s my Christmas gift. It is a lot bigger than expected I will be able to fit everything in it

S
Sue
Perfect Sewing Machine Case

This rolling extra extra large case is absolutely perfect for keeping my Viking Sapphire 930 sewing supplies together. I bought this large machine several years and purchased a case from that company to store my machine. That rolling case was less than satisfactory in size and durability. So, I started investigating other cases. I had learned about Everything Mary at the AQS show in Paducah, KY. This rolling grey case holds my machine with the hard dust cover on it and even has room for the table that slips on the machine. There is also room to spare. I love it!!!

S
Suzanne C.
Large sewing machine rolling case

This rolling case really stores a lot! But, I have to warn you it is heavy so pack accordingly or get help lifting it.

Make Like an Insider