90-day Carefree Guarantee + Free Returns. Learn More

Everything Mary XL 4 Wheel Collapsible Rolling Sewing Machine Storage Case, Tan & Grey Floral

24 items left

Travel beautifully with the Everything Mary XL Rolling Sewing Machine Case in Grey Floral. Designed for makers who craft at home and on the go, this wheeled case offers reliable protection for standard sewing and embroidery machines while keeping tools, fabric, and accessories neatly organized—so every project feels easier, calmer, and more enjoyable.

  • Spacious main compartment – Designed to hold standard sewing machines with room to spare for fabric, patterns, thread, and essential tools.
  • Premium, durable construction – Reinforced polyester with padded lining, strong zippers, and double stitching helps protect your machine and stand up to frequent use.
  • Smooth 4-wheel mobility – Four 360° spinner wheels provide effortless movement through classrooms, workshops, and craft retreats.
  • Organized storage that makes sense – Multiple interior and exterior pockets keep accessories visible, secure, and easy to access.
  • Space-saving, collapsible design – Structured when in use and collapsible for convenient storage when space is tight.

Fit & Dimensions

  • Interior (W x D x H): 19.50" x 10.50" x 14.00"
  • Exterior (W x D x H): 22.00" x 13.50" x 17.75"

Compatibility Note: Sewing machine sizes vary by brand and model. Always compare your machine’s dimensions to the interior measurements listed above to ensure the best fit.

Order today and get free ground shipping for all orders over $49! Please note, all orders are shipped from our warehouse Eugene, Oregon.

We are here to help! Please contact us at care@everythingmary.com. Our average response time is within 18 hours :).

Customer Reviews

Based on 23 reviews
83%
(19)
9%
(2)
0%
(0)
0%
(0)
9%
(2)
T
Terri L.
Fantastic product and customer service

My first experience with Everything Mary has been five stars. Ordered an XL trolley but turned iut to be too small. The exchange was quick and smooth. Product arrived and it’s perfect. Thank you EM

T
Terri

Gorgeous trolley, but it was too small for my Bernina 770, even after measuring three times. Everything about the return process with Everything Mary was great.

M
Mary

It is great. I’m already for some retreats this winter in my area. I love everything that Everything Mary has.

C
Cheryl

Great bag. Well constructed, packaged well and shipped quickly. Looks exactly like the ads and is well made. Highly recommend Everything Mary!

C
Cheryl

Great bag. Well constructed, packaged well and shipped quickly. Looks exactly like the ads and is well made. Highly recommend Everything Mary!

Make Like an Insider