90-day Carefree Guarantee + Free Returns. Learn More

Everything Mary Jumbo Rolling Sewing Machine Case with 5 Wheels in Red & Tan Floral – Extra-Large Padded Craft Storage Tote for Travel & Classes

84 items left

Haul it all with the Everything Mary Jumbo Rolling Sewing Machine Case in Red & Tan Floral. Built for makers who travel with large machines and plenty of supplies, this extra-large wheeled case offers padded protection while keeping fabric, thread, and tools neatly organized. Five smooth spinner wheels and a fold-flat handle make moving a heavy load easy, so every project starts calmer, feels lighter, and stays organized from setup to cleanup.

  • Jumbo padded interior – Holds large machines plus fabric, patterns, and project supplies with capacity to spare.
  • Five-wheel mobility – Five 360-degree spinner wheels and a fold-flat handle move a heavy, loaded case with ease.
  • Padded protection – Cushioned walls help shield your machine and supplies from bumps during transport.
  • Smart organized storage – Dedicated interior and exterior spaces keep cords, notions, and tools easy to reach.
  • Collapsible design – Structured in use and folds flat for convenient storage when space is limited.

Thoughtfully designed by makers, for makers, it keeps your machine protected and your supplies in order—so you can focus on the simple joy of creating.

Fit & Dimensions

  • Interior (W x D x H): 28" x 14" x 14.5"
  • Exterior (W x D x H): 31" x 14.25" x 19"

Compatibility Note: Sewing machine sizes vary by brand and model. Always compare your machine’s dimensions to the interior measurements above to ensure the best fit.

Order today and get free ground shipping for all orders over $49! Please note, all orders are shipped from our warehouse Eugene, Oregon.

We are here to help! Please contact us at care@everythingmary.com. Our average response time is within 18 hours :).

Customer Reviews

Based on 4 reviews
100%
(4)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
M
Mary

The quality looks very good and it was easy to open, just zip it and pop on the wheels. Cant wait to fill it up.

B
BJ
It’s perfect!

Bought this before my baby lock Altair 2 arrived and was nervous it may not fit. What’s so nice is how it zips open so it’s easier to place the sewing machine inside.

D
Darlene
Jumbo trolley

I’ve had my jumbo trolley for a couple weeks. I really appreciate the craftsmanship, all the padding/protection for my sewing machine. My machine is really heavy so the fifth wheel in the center provides great support to protect the trolley from bending and drooping in the middle. It is great for transporting my machine while keeping it protected. I highly recommend this trolley!

A
Anonymous
Jumbo rolling case

just what I needed to take my Brother machine to the dealers. It is a very well made piece and it is collapsible.

Make Like an Insider