90-day Carefree Guarantee + Free Returns. Learn More

Everything Mary Sewing Box Organizer in Red & Tan Floral – Soft-Side Collapsible Sewing Kit Caddy with Pin Cushion & Storage Pocket for Notions

17 items left

Keep your essentials close with the Everything Mary Sewing Box Organizer in Red & Tan Floral. Designed for makers who value a tidy, ready workspace, this soft-side caddy holds thread, scissors, needles, and notions in a roomy interior. A built-in pin cushion keeps pins where you need them, while a handy pocket tucks away patterns and small tools—so mending, sewing, and crafting feel calmer, simpler, and more enjoyable from start to finish.

  • Built-in pin cushion – Keeps pins and needles secure and within reach while you work.
  • Roomy notions interior – Holds thread, scissors, tape, and everyday sewing essentials together.
  • Handy storage pocket – Tucks away patterns, labels, and small tools so your kit stays neat.
  • Soft-side, collapsible – Holds shape in use and folds down for compact, easy storage.
  • Quality craftsmanship – Durable fabric and careful construction stand up to daily use.

Thoughtfully designed by makers, for makers, it keeps your notions organized and ready—so you can focus on the simple joy of creating.

Dimensions (W x D x H): 9.5" x 6" x 6"

Order today and get free ground shipping for all orders over $49! Please note, all orders are shipped from our warehouse in Memphis, Tennessee.

We are here to help! Please contact us at care@everythingmary.com. Our average response time is within 18 hours :).

Customer Reviews

Based on 8 reviews
100%
(8)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
A
Adela M.
Theses are too darn cute!

It’s the perfect size and the quality of the product is superior.

A
Angelita M.F.
Perfect sewing box

This is a perfect size sewing box.

A
Angelita M.F.
Perfect sewing box

This is a perfect size!

A
Angelita M.F.
Perfect size!

This box is the perfect size.

B
Barbara L.
Love it!

Beautiful look and superior craftsmanship.

Make Like an Insider