90-day Carefree Guarantee + Free Returns. Learn More

XL 4 Wheel Collapsible Deluxe Rolling Sewing Machine Storage Case, Black & Floral

The Everything Mary 4 Wheel Collapsible Deluxe Sewing Machine Storage Case is the perfect option for traveling with your sewing machine. This sewing machine trolley is constructed with a beautiful, high-quality polyester material that is smudge-proof and super easy to clean. This carrying machine case keeps your valuable Brother, Singer, Babylock, Viking, or any other brand sewing machine protected. In addition to being a large sewing machine storage space, this case packs a mighty punch for storing notions, accessories, and more. Our sewing rolling bags travel easily with 4 wheels that spin 360 degrees. The Everything Mary 4 Wheel Collapsible Deluxe Sewing Machine Storage Case was made with crafters in mind.

Interior Dimensions: 19.5L x 10.5D x 14H
Exterior Dimensions: 22L x 13.50D x 17.75H 

Order today and get free ground shipping for all orders over $49! Please note, all orders are shipped from our warehouse Eugene, Oregon.

We are here to help! Please contact us at care@everythingmary.com. Our average response time is within 18 hours :).

Customer Reviews

Based on 19 reviews
89%
(17)
5%
(1)
0%
(0)
0%
(0)
5%
(1)
M
Mary

It is great. I’m already for some retreats this winter in my area. I love everything that Everything Mary has.

C
Cheryl

Great bag. Well constructed, packaged well and shipped quickly. Looks exactly like the ads and is well made. Highly recommend Everything Mary!

C
Cheryl

Great bag. Well constructed, packaged well and shipped quickly. Looks exactly like the ads and is well made. Highly recommend Everything Mary!

T
Tammy F.
Great case

It arrived fast fits my machine well. I can’t wait for my next class to use it

K
Kim H.
XL 4 Wheel Collapsible Deluxe Sewing Machine Storage Case

Looks of the case is beautiful! Plenty of pockets all around. However, I purchased a Viking 500 machine with cover, small plastic case with extra feet and manual. The actual trolly with the wheels attached to the case, doesn’t feel strong or sturdy enough when you try to roll it across the floor.

Make Like an Insider