90-day Carefree Guarantee + Free Returns. Learn More

Everything Mary XXL 4 Wheel Collapsible Rolling Sewing Machine Storage Case, Grey Floral

34 items left

Big machine? Big project? This travel-ready roller is built to move it all—smoothly. The Everything Mary XXL Rolling Sewing Machine Case pairs a roomy, protective main compartment with smart storage, so your machine and supplies stay organized from sewing room to class to retreat.

  • Spacious main compartment – Designed for larger sewing and embroidery machines with extra room for fabric, thread, patterns, and tools.
  • Easy-glide mobility – Four 360° spinner wheels help you maneuver through tight spaces without awkward tilting or dragging.
  • Durable construction – Reinforced polyester helps protect your gear during travel and everyday use.
  • Smart organization – Multiple pockets keep accessories visible, sorted, and easy to access.
  • Secure transport – Reinforced handles and dependable zippers help keep everything stable while on the move.

Fit & Dimensions

  • Interior (W x D x H): 22.00" x 12.50" x 16.00"
  • Exterior (W x D x H): 26.50" x 15.50" x 19.75"

Compatibility Note: Machine fit can vary by brand and model. Always compare your machine’s dimensions to the interior measurements listed above to ensure the best fit.

Order today and get free ground shipping for all orders over $49! Please note, all orders are shipped from our warehouse Eugene, Oregon.

We are here to help! Please contact us at care@everythingmary.com. Our average response time is within 18 hours :).

Customer Reviews

Based on 28 reviews
82%
(23)
4%
(1)
0%
(0)
0%
(0)
14%
(4)
N
Novice S.
Great XXL Sewing Machine Case, Wonderful Customer Service and FAST Shipping

I forgot to apply my welcome coupon, so I emailed customer service and within a few hours they had issued a refund for the discounted amount. The case itself is sturdy, and the color (I got purple) is exactly as pictured.
My only issues are the side zippers were a pain to close, but I don't plan to unzip it again, so it was once and done, and the plastic pockets on the upper lid seem a bit flimsy, only being held on by a single wobbly line of stitching. Maybe I won't pack those too full...
The wheels however are like butter and it's kinda fun to roll it around. Granted, I have non-carpeted floors but considering how smooth the wheels are, carpet shouldn't be an issue.
I got this case to grow into, I currently have my machine, my iron and tracing paper, crochet and knitting needles and all the accompanying notions with still so much room to spare.
The fast shipping is enough to make me come here first when I need something delivered in record time (it shipped from Memphis TN and I live in South Texas), and it was free!

D
Dawn

It seems to be good quality, I haven’t really checked too much as it’s my Christmas gift. It is a lot bigger than expected I will be able to fit everything in it

S
Sue
Perfect Sewing Machine Case

This rolling extra extra large case is absolutely perfect for keeping my Viking Sapphire 930 sewing supplies together. I bought this large machine several years and purchased a case from that company to store my machine. That rolling case was less than satisfactory in size and durability. So, I started investigating other cases. I had learned about Everything Mary at the AQS show in Paducah, KY. This rolling grey case holds my machine with the hard dust cover on it and even has room for the table that slips on the machine. There is also room to spare. I love it!!!

S
Suzanne C.
Large sewing machine rolling case

This rolling case really stores a lot! But, I have to warn you it is heavy so pack accordingly or get help lifting it.

A
Ann N.
XXL Rolling Sewing Tote

Purchased this item so that I could transport machine to weekly local QOV workshops. While I don't take my large Bernia 740 to these events I wanted to have the ability. Case fits the Bernia machine perfectly with lots on inside storage pockets. With handle extended easy to roll case. Side handles make for easy lifting into car. Shipping was quick and no issues with package on arrival.

Make Like an Insider