90-day Carefree Guarantee + Free Returns. Learn More

Everything Mary XL Rolling Sewing Machine Case with Wheels in Quilted Pattern – Sewing Machine Tote Bag for Travel, Classes & Quilting

174 items left

Sew anywhere with the Everything Mary XL Rolling Sewing Machine Case in Quilted Pattern. Built for makers who create at home and on the move, this wheeled case protects most standard sewing and embroidery machines while keeping fabric, thread, and tools neatly organized. A telescopic handle and smooth wheels make transport to classes and retreats easy, so every project starts calmer, feels lighter, and stays beautifully organized from setup to cleanup.

  • Spacious interior – Securely holds most standard sewing machines with extra room for fabric, patterns, thread, and tools.
  • Smooth rolling mobility – Four 360-degree spinner wheels and a telescopic handle make moving a heavy machine effortless.
  • Organized storage – Multiple interior and exterior pockets keep accessories visible, secure, and easy to reach.
  • Collapsible design – Structured in use and folds flat for convenient storage when space is limited.
  • Durable construction – Quality materials and reinforced stitching stand up to frequent use and on-the-go crafting.

Thoughtfully designed by makers, for makers, it keeps your machine protected and your supplies in order—so you can focus on the simple joy of creating.

Fit & Dimensions

  • Interior (W x D x H): 19.5" x 10.5" x 14"
  • Exterior (W x D x H): 22" x 13.5" x 17.75"

Compatibility Note: Sewing machine sizes vary by brand and model. Always compare your machine’s dimensions to the interior measurements above to ensure the best fit.

Order today and get free ground shipping for all orders over $49! Please note, all orders are shipped from our warehouse Eugene, Oregon.

We are here to help! Please contact us at care@everythingmary.com. Our average response time is within 18 hours :).

Customer Reviews

Based on 23 reviews
83%
(19)
9%
(2)
0%
(0)
0%
(0)
9%
(2)
T
Terri L.
Fantastic product and customer service

My first experience with Everything Mary has been five stars. Ordered an XL trolley but turned iut to be too small. The exchange was quick and smooth. Product arrived and it’s perfect. Thank you EM

T
Terri

Gorgeous trolley, but it was too small for my Bernina 770, even after measuring three times. Everything about the return process with Everything Mary was great.

M
Mary

It is great. I’m already for some retreats this winter in my area. I love everything that Everything Mary has.

C
Cheryl

Great bag. Well constructed, packaged well and shipped quickly. Looks exactly like the ads and is well made. Highly recommend Everything Mary!

C
Cheryl

Great bag. Well constructed, packaged well and shipped quickly. Looks exactly like the ads and is well made. Highly recommend Everything Mary!

Make Like an Insider