90-day Carefree Guarantee + Free Returns. Learn More

Everything Mary Rolling Serger Tote with Wheels in Red & Tan Floral – Serger Machine Carrying Case with Securing Strap for Travel & Classes

27 items left

Carry your serger with confidence using the Everything Mary Rolling Serger Tote in Red & Tan Floral. Shaped specifically for serger and overlock machines, this wheeled tote protects your machine while keeping thread cones, tools, and accessories neatly organized. A securing strap holds the serger steady, and two wheels with an extendable handle make transport to classes and retreats easy—so every project starts calmer, feels lighter, and stays organized from setup to cleanup.

  • Made for sergers – A fitted interior shaped for serger and overlock machines holds your machine securely.
  • Wheels and extendable handle – Two smooth wheels and a pull handle make rolling a heavier serger effortless.
  • Interior securing strap – Holds the machine steady and centered to reduce shifting during transport.
  • Dedicated storage spaces – Pockets and compartments keep thread cones, tools, and accessories easy to reach.
  • Collapsible design – Structured in use and folds flat for convenient storage when space is limited.

Thoughtfully designed by makers, for makers, it keeps your serger protected and your supplies in order—so you can focus on the simple joy of creating.

Fit & Dimensions

  • Interior (W x D x H): 13.5" x 10" x 13.5"
  • Exterior (W x D x H): 14.5" x 12.5" x 17.5"

Compatibility Note: Serger and overlock machine sizes vary by brand and model. Always compare your machine’s dimensions to the interior measurements above to ensure the best fit.

Order today and get free ground shipping for all orders over $49! Please note, all orders are shipped from our warehouse in Memphis, Tennessee.

We are here to help! Please contact us at care@everythingmary.com. Our average response time is within 18 hours :).

Customer Reviews

Based on 4 reviews
25%
(1)
25%
(1)
25%
(1)
0%
(0)
25%
(1)
C
Christina F.
Good case for my cover stitch.

Easy to assemble and pockets are nice. Not padded at all, I wasn't really expecting any, but I am going to add a bottom layer of padding for a smooth ride. Nicely sewn together and sturdy. Fits my Bernette 42 Funlock Coverstitch.

K
Kathleen A.
Nice but flap packed folded so was damaged during shipping. Not as much extra room as I thought i...

Machine fit perfectly but no room for pedal. Had to use outside pocket and they could be made a lot roomier for the pedal and cord. All in all it is very pretty. 3 stars because of sloppy packing damaged the top flap of 1 pocket being folded. The outside pockets need to have more depth and longer too flaps.
But overall I like it. Especially the whole front dropping down for easy access to remove the machine and pretty material.

T
Tuhfah I.
Nice bag but not great quality.

I was super excited to get my bag last week, but since using it the Velcro on the flaps have come undone. The sewing is not very reinforced. I’m going to have to invest in a new bag, more than likely not this brand because I’m worried about the quality.

J
Jordyn A.
Cheap quality

For the price, I was expecting better quality. The top inside clear pouch is so flimsy. The bag doesn't zip all the way closed and it is just really poor quality.

Make Like an Insider