90-day Carefree Guarantee + Free Returns. Learn More

Everything Mary XXL 4 Wheel Collapsible Rolling Sewing Machine Storage Case, Black Floral

18 items left

Interior dimensions: 22" L x 12.5" W x 16" H 

Exterior dimensions: 26.50" L x 15.50" W x 19.75" H 

*A sewing machine is not included with this bag.* The Everything Mary XXL Rolling Sewing Tote was designed with larger sewing & embroidery machines in mind. The XXL sewing bag on wheels is nothing short of premium. Our sewing machine storage case is constructed with a beautiful, high-quality polyester material that is smudge-proof and easy to clean. Featuring the interior dimension of 22" L x 12.5" W x 16" H, this carrying machine case keeps your valuable Brother, Singer, Bernina, Babylock, Viking, or any other large sewing machine case safe and concealed. Along with large sewing machine storage, this case features multiple storage pockets, a locking handle, convenient carry straps, an interior machine strap, and 4-wheel Quad Rollers. The Everything Mary XXL Rolling Sewing Tote was made with crafters in mind.

Order today and get free ground shipping for all orders over $49! Please note, all orders are shipped from our warehouse Eugene, Oregon.

We are here to help! Please contact us at care@everythingmary.com. Our average response time is within 18 hours :).

Customer Reviews
5.0 Based on 6 Reviews
5 ★
100% 
6
4 ★
0% 
0
3 ★
0% 
0
2 ★
0% 
0
1 ★
0% 
0
Write a Review

Thank you for submitting a review!

Your input is very much appreciated. Share it with your friends so they can enjoy it too!

Filter Reviews:
    AS
    01/23/2023
    Andrea S.
    United States

    Perfect storage solution

    I love that I have a place to store all of my sewing things and can easily move it where I want to take my machine and supplies. My machine feels protected and I have so much room for all of my things. I love all of the organizing features of my tote. Besides having the wheels to move it, I love the handles on the sides so it’s easy to put in my car.

    AF
    10/30/2022
    Adriana F.
    United States United States

    Great tote

    Very happy with my new tote just the right size to stow the sewing machine and all my project supplies while I am on the go. It has enough padding to protect and keep the machine safe. The tote is made well with lots of pockets for storage

    D
    10/06/2022
    dana
    United States United States

    HOW IS IT POSSIBLE A SOLARIS 2 FITS IN THIS BAG

    HOW WERE YOU ABLE TO FIT A SOLARIS 2 TO FIT THIS BAG. THE DIMENSIONS OF THE MACHINE ARE LARGER THAN THE BAG, AS VERIFIED BY THIS COMPANY. I'M SHOPPING FOR A BAG TO FIT THE LUMINARE XP2, WHICH HAS SAME DIMENSIONS OF THE SOLARIS 2. THANKS.

    SB
    08/15/2022
    Sandra B.
    United States United States

    Excellent bag!

    Exactly what I was looking for. Large, sturdy and with lots of pockets.

    CK
    07/29/2022
    Carol K.
    United States United States

    Perfect

    I have a new Solaris 2this bag is perfect and that it folds up when not in use is a bonus!

    Make Like an Insider