90-day Carefree Guarantee + Free Returns. Learn More

Everything Mary XXL 4 Wheel Collapsible Rolling Sewing Machine Storage Case, Black Quilted

37 items left

The XXL Sewing Tote on Wheels is the ultimate solution for crafters and sewing enthusiasts seeking a spacious, secure, and portable way to store and transport their sewing machines and supplies. Crafted from durable, high-quality polyester, this bag provides long-lasting protection with a patent-pending design that ensures your machine stays safe and organized. Featuring a roomy main compartment with multiple pockets and compartments, it offers ample space for threads, fabric, scissors, patterns, and other essential tools, keeping everything neatly in place and easy to access. The four smooth-rolling wheels and sturdy, ergonomic handles make it incredibly easy to transport your sewing machine and supplies from one location to the next, making it ideal for classes, craft fairs, or creative retreats. Built to withstand frequent use with reinforced stitching, this bag is designed to meet the needs of avid crafters, offering both maximum organization and convenience. With its innovative design, this XXL Sewing Tote on Wheels is the perfect storage solution for anyone looking to protect and organize their sewing equipment while on the go.

Interior dimensions: 21.5L x 13W x 15H 
Exterior dimensions: 26L x 16W x 19H 

Order today and get free ground shipping for all orders over $49! Please note, all orders are shipped from our warehouse in Memphis, Tennessee.

We are here to help! Please contact us at care@everythingmary.com. Our average response time is within 18 hours :).

Customer Reviews

Based on 29 reviews
83%
(24)
3%
(1)
0%
(0)
0%
(0)
14%
(4)
K
Kathleen W.
Holds EVERYTHING

What a fabulous case! It is heavy, though, but sturdy and I have no fear of shifting items or tipping since the wheels are so stable. The only request I have - and it's not a criticism - is that it would have been helpful to have more information as to which machines fit which case. Even with measuring the XXL case is far too large for my 300 series Bernina. BUT, everything fits - the machine, knee lever, table extension, feet case, fabric, all the supplies I need to bring to quilting class - so the extra space has been helpful and well utilized. A plus is how classy it looks!

N
Novice S.
Great XXL Sewing Machine Case, Wonderful Customer Service and FAST Shipping

I forgot to apply my welcome coupon, so I emailed customer service and within a few hours they had issued a refund for the discounted amount. The case itself is sturdy, and the color (I got purple) is exactly as pictured.
My only issues are the side zippers were a pain to close, but I don't plan to unzip it again, so it was once and done, and the plastic pockets on the upper lid seem a bit flimsy, only being held on by a single wobbly line of stitching. Maybe I won't pack those too full...
The wheels however are like butter and it's kinda fun to roll it around. Granted, I have non-carpeted floors but considering how smooth the wheels are, carpet shouldn't be an issue.
I got this case to grow into, I currently have my machine, my iron and tracing paper, crochet and knitting needles and all the accompanying notions with still so much room to spare.
The fast shipping is enough to make me come here first when I need something delivered in record time (it shipped from Memphis TN and I live in South Texas), and it was free!

D
Dawn

It seems to be good quality, I haven’t really checked too much as it’s my Christmas gift. It is a lot bigger than expected I will be able to fit everything in it

S
Sue
Perfect Sewing Machine Case

This rolling extra extra large case is absolutely perfect for keeping my Viking Sapphire 930 sewing supplies together. I bought this large machine several years and purchased a case from that company to store my machine. That rolling case was less than satisfactory in size and durability. So, I started investigating other cases. I had learned about Everything Mary at the AQS show in Paducah, KY. This rolling grey case holds my machine with the hard dust cover on it and even has room for the table that slips on the machine. There is also room to spare. I love it!!!

S
Suzanne C.
Large sewing machine rolling case

This rolling case really stores a lot! But, I have to warn you it is heavy so pack accordingly or get help lifting it.

Make Like an Insider