90-day Carefree Guarantee + Free Returns. Learn More

Everything Mary XXL 4 Wheel Collapsible Rolling Sewing Machine Storage Case, Black Floral

11 items left

Travel beautifully with the Everything Mary XXL Rolling Sewing Machine Case in Black Floral. Designed for sewists who need maximum space and dependable protection, this wheeled craft tote comfortably fits larger sewing and embroidery machines while keeping accessories organized and secure—so heading to class, retreats, or workshops feels effortless and polished.

  • Extra-spacious main compartment – Sized to hold large sewing machines with room to spare for fabric, thread, patterns, and tools.
  • Durable, reinforced construction – Crafted from smudge-resistant polyester with padded walls to help protect your machine during storage and travel.
  • Smooth 4-wheel mobility – Four 360° spinner wheels and reinforced handles allow for stable, comfortable rolling through tight spaces.
  • Organized storage that works – Multiple exterior pockets and interior straps keep accessories secure, visible, and easy to reach.
  • Built for busy makers – Reliable zippers and thoughtful construction keep everything steady while you’re on the move.

Fit & Dimensions

  • Interior (W x D x H): 22.00" x 12.50" x 16.00"
  • Exterior (W x D x H): 26.50" x 15.50" x 19.75"

Compatibility Note: Sewing machine sizes vary by brand and model. Always compare your machine’s dimensions to the interior measurements listed above to ensure the best fit.

Order today and get free ground shipping for all orders over $49! Please note, all orders are shipped from our warehouse Eugene, Oregon.

We are here to help! Please contact us at care@everythingmary.com. Our average response time is within 18 hours :).

Customer Reviews

Based on 27 reviews
81%
(22)
4%
(1)
0%
(0)
0%
(0)
15%
(4)
D
Dawn

It seems to be good quality, I haven’t really checked too much as it’s my Christmas gift. It is a lot bigger than expected I will be able to fit everything in it

S
Sue
Perfect Sewing Machine Case

This rolling extra extra large case is absolutely perfect for keeping my Viking Sapphire 930 sewing supplies together. I bought this large machine several years and purchased a case from that company to store my machine. That rolling case was less than satisfactory in size and durability. So, I started investigating other cases. I had learned about Everything Mary at the AQS show in Paducah, KY. This rolling grey case holds my machine with the hard dust cover on it and even has room for the table that slips on the machine. There is also room to spare. I love it!!!

S
Suzanne C.
Large sewing machine rolling case

This rolling case really stores a lot! But, I have to warn you it is heavy so pack accordingly or get help lifting it.

A
Ann N.
XXL Rolling Sewing Tote

Purchased this item so that I could transport machine to weekly local QOV workshops. While I don't take my large Bernia 740 to these events I wanted to have the ability. Case fits the Bernia machine perfectly with lots on inside storage pockets. With handle extended easy to roll case. Side handles make for easy lifting into car. Shipping was quick and no issues with package on arrival.

A
Andrea S.
Perfect storage solution

I love that I have a place to store all of my sewing things and can easily move it where I want to take my machine and supplies. My machine feels protected and I have so much room for all of my things. I love all of the organizing features of my tote. Besides having the wheels to move it, I love the handles on the sides so it’s easy to put in my car.

Make Like an Insider